  1. (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. 
  2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? 
  3. (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is 
  4. (TCO 3) Scheduling in service systems may involve scheduling which of the following?
  5. (TCO 5) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:
  6. (TCO 6) Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of 
  7. (TCO 7) With regard to suppliers, JIT systems typically require 
  8. (TCO 10) Which of the following is characteristic of the JIT philosophy?
  9. (TCO 1) In make-to-stock systems, fluctuations in sales volume are managed through which of the following? 
  10. (TCO 5) In an MRP master schedule, the planning horizon is often separated into a series of times periods called

Page 2

  1. (TCO 8) Explain how cellular manufacturing represents a flexible manufacturing system. 
  2. (TCO 11) State the four building blocks of lean operations, and explain how fast and simple are the two common threads that run through them. 
  3. (TCO 9) Elaborate on the statement: “The output of the system cannot exceed the output of the bottleneck operation(s).” 
  4. (TCO 4) Differentiate between infinite loading and finite loading as two major approaches used to load work centers.
  5. (TCO 12) The theory of constraints has a goal of maximizing flow through the entire system. 
  6. (TCO 2) Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
  7. (TCO 10) Respond to the question: “Which is better, MRP or JIT?” 
  8. (TCO 1) The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale. 
  9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes. 
  10. (TCO 10) Manufacturing strategy also drives the choice of the shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice.

Need Assistance with the Exams?

 

Are you seeking out online exam help? Our take my online take look at specialists will prevent all of the pressure you are taking to clear up checks online. Our examination helper will manual you with the maximum correct answer on your online examination preparations. We propose you seek advice from our online examination helper to discover the proper route for clearing your take-look. Our crew has furnished online examination assistance to many college students in famous international locations just as the United States, Canada, Australia, and the United Kingdom, in which college students have acquired suitable grades. So, what are you ready for? Take this golden possibility to excel to your take a look. Chat with us today!

 

Scott Belmont from NYC, USA
Hired a tutor to take programming class and final exam
40 minutes ago
Ebony Nicole from Bronx, USA
Hired a tutor to take history and algebra final exams
2 hours ago
Randy Wells from Texas, USA
Hired an expert to take chemistry proctored exam
1 hour ago
Kurt LeBlanc from Iowa, USA
Hired an expert to take statistics online exam
1 hour ago